Transforming the Lakefront through Phased Investment

The North Coast Connector will bridge the divide that has separated Cleveland's city center from Lake Erie for generations—making the lakefront more accessible for residents and visitors while unlocking substantial economic development potential along one of the nation's most promising urban waterfronts.

The North Coast Connector is a proposed land bridge connecting the downtown to the lakefront. It will span over the railroad tracks and the Shoreway (State Route 2) to restore access and repair more than a century-old divide, opening up new land for community gatherings and future economic development. State Route 2 will be converted from a limited access freeway to a safer lower-speed local boulevard.

The North Coast Connector will advance through multiple phases. Phase 1 refers to the first construction package, which includes the Shoreway conversion from approximately West 9th Street to east of East 9th Street, and associated infrastructure improvements, including the land bridge. Phase 2 will run from east of East 9th Street to the Innerbelt Curve and will advance once the city obtains construction funding.


The first construction package includes the Shoreway conversion to a boulevard between West 9th Street and east of East 9th Street, construction of a Land Bridge, W. 3rd Street Bridge improvements, dedicated Port access, demolition work, retaining walls, sidewalks, multi-use paths, and related infrastructure needed before later project elements can move forward.


The City is currently coordinating National Environmental Policy Act (NEPA) approval, identifying major utility relocations, identifying necessary right-of-way parcels, acquiring key permits, and preparing a financial plan, which includes Federal Highway Administration (FHWA) funding.


The North Coast Connector is poised to create significant opportunities for businesses located in Cleveland, Northeast Ohio, and across the United States.

Proposed Procurement Approach

The City anticipates delivering the Project under a Progressive Design-Build (PDB) procurement model
(subject to change at the City's discretion).

North Coast Connector
Procurement Links

Access helpful resources and links for current and upcoming procurement opportunities

DOWNLOAD PDF · 46 slides · 5 MB

Visit OpenGov to access project documentation, procurement materials, and other important resources related to the North Coast Connector.

Visit OpenGov

Access North Coast Connector media resources, project information, and downloadable materials.

DOWNLOAD MEDIA KIT ZIP archive · 67 MB

Have a question about the
North Coast Connector?

Whether you're looking for more information, have feedback to share, or want to learn how the project may affect your community, the North Coast Connector team is available to help. Your input plays an important role in the project's success.

CONNECT WITH US
© 2021 – 2026 Cleveland's North Coast. All rights reserved. Made with